Detailed, integrated technical documentation for architecture, structure, and MEP, for office buildings, factories, industrial estates, schools, hospitals, and houses of two floors or more.
Detail Engineering Design (DED) is a key stage in construction project planning that covers the preparation of technical drawings, material specifications, and detailed planning documents. PT. Kaizen Enjiniring Nusantara prepares integrated architectural, structural, and MEP DED for projects across Indonesia, so the risk of errors during construction is kept to a minimum.
Our team follows a structured process to make sure every DED document is prepared with precision.
Understanding the needs, function, and goals of the project together with the client.
Site survey and collection of supporting technical data.
Preparing architectural, structural, and MEP working drawings together with their specifications.
Checking coordination between disciplines, then handing over the final documents.
Handled by certified experts with broad experience.
Every DED document is prepared to a high standard with full detail.
We work closely with clients to make sure the design meets their needs.
We use the latest software and technology for high accuracy.
Detail Engineering Design (DED) is a key stage in construction project planning that covers the preparation of technical drawings, material specifications, and detailed planning documents. DED services make sure every aspect of the project is designed accurately and in line with the client's needs, minimizing the risk of errors during construction.
A complete DED document consists of three main disciplines, namely Architecture, Structure, and MEP (Mechanical, Electrical, Plumbing), which must be integrated with each other without clashes, together with technical material specifications.
A DED is needed before construction starts, whether for a new building, a major renovation, an added floor, or a change of use, and whenever the project requires technical documents for tenders and permits.
A concept design gives an initial picture of the form and function of a building, while a DED translates it into detailed working drawings and technical specifications that are ready to be used for construction.
The duration depends on the scale, complexity, and completeness of the project data. Our team provides a time estimate after the initial discussion and data collection.
A Building Approval (PBG) application requires technical plan documents for architecture, structure, and MEP. A complete DED can serve as the basis for preparing those documents.
A technical evaluation of a building's condition for SLF, renovation, or post-disaster needs.
Building Functionality Certificate processing for commercial buildings, factories, and houses.
Design, analysis, and survey of telecommunication towers to fit project needs.
Talk through your DED needs with our experienced engineering team. Free, no commitment.