Detail Engineering Design (DED) Services, the Foundation of Your Project's Success

Detailed, integrated technical documentation for architecture, structure, and MEP, for office buildings, factories, industrial estates, schools, hospitals, and houses of two floors or more.

Detail Engineering Design (DED) is a key stage in construction project planning that covers the preparation of technical drawings, material specifications, and detailed planning documents. PT. Kaizen Enjiniring Nusantara prepares integrated architectural, structural, and MEP DED for projects across Indonesia, so the risk of errors during construction is kept to a minimum.

How Does Our DED Process Work?

Our team follows a structured process to make sure every DED document is prepared with precision.

Initial Discussion

Understanding the needs, function, and goals of the project together with the client.

Data Collection

Site survey and collection of supporting technical data.

Technical Design

Preparing architectural, structural, and MEP working drawings together with their specifications.

Validation and Finalization

Checking coordination between disciplines, then handing over the final documents.

Why Choose Kaizen's DED Services?

Professional Team

Handled by certified experts with broad experience.

Complete Documentation

Every DED document is prepared to a high standard with full detail.

Collaborative Approach

We work closely with clients to make sure the design meets their needs.

Modern Technology

We use the latest software and technology for high accuracy.

Frequently Asked Questions About Detail Engineering Design

What is Detail Engineering Design (DED)?

Detail Engineering Design (DED) is a key stage in construction project planning that covers the preparation of technical drawings, material specifications, and detailed planning documents. DED services make sure every aspect of the project is designed accurately and in line with the client's needs, minimizing the risk of errors during construction.

What does a DED document contain?

A complete DED document consists of three main disciplines, namely Architecture, Structure, and MEP (Mechanical, Electrical, Plumbing), which must be integrated with each other without clashes, together with technical material specifications.

When does a project need a DED?

A DED is needed before construction starts, whether for a new building, a major renovation, an added floor, or a change of use, and whenever the project requires technical documents for tenders and permits.

What is the difference between a DED and a concept design?

A concept design gives an initial picture of the form and function of a building, while a DED translates it into detailed working drawings and technical specifications that are ready to be used for construction.

How long does it take to prepare a DED?

The duration depends on the scale, complexity, and completeness of the project data. Our team provides a time estimate after the initial discussion and data collection.

Is a DED required to apply for a PBG?

A Building Approval (PBG) application requires technical plan documents for architecture, structure, and MEP. A complete DED can serve as the basis for preparing those documents.

Related Services

Ready to Start Planning Your Project?

Talk through your DED needs with our experienced engineering team. Free, no commitment.